Forecast the trial. Supply the world.
Adaptive designs, global depots, shifting enrollment. OPFOR builds supply strategies that hold under pressure without a single manual spreadsheet update.
We build your entire portfolio for you. 25% less expired drug than your current plan.
Capabilities
001
Demand Forecasting
Kit-level demand resolved per protocol, arm, and visit schedule, not per quarter, per
patient-visit.
±0.4% / cohort
002
Scenario Simulation
Enrollment curves, titration branches, and dropout rates simulated in thousands of Monte
Carlo runs before first shipment.
10,000 runs / min
003
Depot & Distribution
Global depot network planning with lane-level lead times, customs buffers, and cold-chain
constraints built in.
38 countries
004
Expiry & Wastage
Shelf-life-aware allocation that ships the right lot to the right depot. Overage cut
without touching continuity.
lot-level expiry
005
Actuals Reforecast
IRT reports transmit planned vs. actual data, modeling it into a continuously updated
real-time forecast.
24 h cycle
Method
1
Configure
Enter protocol assumptions: arms, visit schedules, titration logic, kit definitions, depot lanes. The trial becomes a formal supply model in minutes, not months.
Protocol → Model2
Forecast
Simulate enrollment, dropout, and demand across thousands of scenarios. Output: a production and distribution plan with quantified confidence bands.
Model → Plan3
Act
Live study actuals drives daily reforecasts. Orders, transfers, and lot allocations adjust before deviation becomes disruption.
Plan → SupplyThe lane atlas
SOURCE: OPFOR LANE SURVEY, 2020–2026 · GREAT-CIRCLE KM, DOOR-TO-DOOR
LEADMEAN LEAD DEVIATION ±2.1 H
Enrollment vs. coverage
Enrollment (patients)Supply coverage (kits
staged)
MO — · ENR — · COV —
STUDY SAMP-201 · 36-MONTH WINDOW · COVERAGE FLOOR 1.12× DEMANDHOVER FOR
CROSSHAIR
03 / 03 · Request a demo
Unlimited by default
Scenarios, seats, and protocols. No per-study fees, no per-seat math.